07 / SHIPPING ACROSS THE UNITED STATES
BUILT FOR YOUR SITE.
PLANNED FOR
THE JOURNEY.
Shipping available across the USA. A delivery plan that respects what happens after the freight truck arrives.
01 / THE ROUTEDestination, approach roads, grades, bridges, turning space, overhead clearance and seasonal access.
02 / THE HANDOFFConfirmed packed dimensions and weight, carrier access, receiving contact and suitable unloading equipment.
03 / THE SITEPrepared support surface, drainage, utility connections, storage location and working room around the equipment.
04 / THE STARTUPLocal qualified trades, permitting, verification, commissioning and operating responsibility defined before shipment.
Freight, unloading and site installation are separately scoped. Alaska, Hawaii, islands and difficult-access destinations require route-specific arrangements. Shipment availability is not a promise of nationwide same-day field service. Systems ship drained unless a transport-approved exception is expressly specified.
Tell us where it needs to go ↗